Headingley Golf Club Gets New Air Conditioning
As part of a three month refurbishment programme, Headingley Golf Club contracted Kirwin AC to strip out the existing Aircon systems and replace with new.
Five 7.0kW Ceiling cassettes were removed in order that the client could raise the ceiling levels. To maintain aesthetics we proposed the installation of two Daikin ducted systems, 7.0 and 12.5kW. Spiral ducts running around the room perimeter are to be incorporated into a decorative bulkhead with conditioned air introduced via linear grilles. Photos show first fix of ducted units and ductwork.